---
product_id: 64209253
title: "Extra Long Line Training Dog Leash With Handle - Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard - 20m-65ft (Blue)"
brand: "ploopy"
price: "€ 31.48"
currency: EUR
in_stock: true
category: "Misc."
url: https://www.desertcart.es/products/64209253-extra-long-line-training-dog-leash-with-handle-long-lead
store_origin: ES
region: Spain
---

# Extra Long Line Training Dog Leash With Handle - Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard - 20m-65ft (Blue)

**Brand:** ploopy
**Price:** € 31.48
**Availability:** ✅ In Stock

## Quick Answers

- **What is this?** Extra Long Line Training Dog Leash With Handle - Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard - 20m-65ft (Blue) by ploopy
- **How much does it cost?** € 31.48 with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.es](https://www.desertcart.es/products/64209253-extra-long-line-training-dog-leash-with-handle-long-lead)

## Best For

- ploopy enthusiasts

## Why This Product

- Trusted ploopy brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Description

Specification:  Material: Durable nylon + metal hook Available in Three Size:10m(33 foot), 15m(50 foot), 20m(65 foot) Width:2.5cm Color:Black; Blue  Package Included:   1 * Long Dog Training Lead   Features:  1.From now you can walk your pet whether it's rainy or snowy. The leash is none the worse for it. Being made of durable nylon, this accessory is not only tear, wear and water-resistant, it 's also super strong. Fully reliable for tracking, patrolling work or walking, this nylon dog lead deserves your attention. The gear is super long giving your pet enough freedom when walking.   2.Perfect for training, tracking and walking nylon dog leash will quickly become your favourite one and replace all the others in your pet's collection. Appreciate its light weight, super wear-resistance and incredible practicability - everything is due to nylon material. Only nylon dog gear can be worn at any weather and it won't be spoiled. Nylon dog leash doesn't even stretch or deform because we use only premium quality stuff.  3.Hardware fully corresponds the declared quality of the item. The leash is equipped with metal hook, which will never rust or tarnish. It is strong, sturdy and long-lasting. The hook is double stitched as all the item to achieve additional reliability. As for cleaning the gear, you can wash it when needed. Cleaning and washing are not a problem because nylon dries out quickly and stands water contact perfectly.  Our Service:  Ploopy focus on provide high quality products for your lovely pet. Hope that our products can bring your pet a healthy and happy life. please e-mail us, if you have any problem or suggestions with our products, we will serve you wholeheartedly.

## Features

- ★Size: Length:20m; Width:2.5cm;Material:Durable nylon + metal hook
- ★Function: The dog training lead is a valuble tool for dogs and ofen used for dogs who need more training or who are not allowed off the lead for one reason or another, the most popular being either lack of recall (coming when called) or aggression towards other dogs.
- ★New Design: Trigger hook for easy attachment to your dog's own collar, rotated by 360 degree allows your pet to play more secure. Allows you to teach your dog recalls and other obedience skills.
- ★High Quality: Made from strong nylon, Quality durable metal hook. Easy to wear and remove,Help you take your dog easily
- ★Suitable For: Teddy, Chihuahua, Miniature pinscher, Schnauzer, Samo, Husky, Golden Retriever, German Shepherd , Rottweiler , Alaska , Tibetan mastiff and other pets.

## Images

![Extra Long Line Training Dog Leash With Handle - Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard - 20m-65ft (Blue) - Image 1](https://images-eu.ssl-images-amazon.com/images/I/51aUcNLVA1L.jpg)
![Extra Long Line Training Dog Leash With Handle - Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard - 20m-65ft (Blue) - Image 2](https://images-eu.ssl-images-amazon.com/images/I/51RvkSR4ccL.jpg)
![Extra Long Line Training Dog Leash With Handle - Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard - 20m-65ft (Blue) - Image 3](https://images-eu.ssl-images-amazon.com/images/I/517XrLtekIL.jpg)
![Extra Long Line Training Dog Leash With Handle - Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard - 20m-65ft (Blue) - Image 4](https://images-eu.ssl-images-amazon.com/images/I/61OfMZZWN7L.jpg)
![Extra Long Line Training Dog Leash With Handle - Long Lead For Large, Medium and Small Dogs - Great for Training, Play, Camping, or Backyard - 20m-65ft (Blue) - Image 5](https://images-eu.ssl-images-amazon.com/images/I/51KRvNOWc9L.jpg)

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.es/products/64209253-extra-long-line-training-dog-leash-with-handle-long-lead](https://www.desertcart.es/products/64209253-extra-long-line-training-dog-leash-with-handle-long-lead)

---

*Product available on Desertcart Spain*
*Store origin: ES*
*Last updated: 2026-08-19*